Buy and Download this COMPLETE Service and Repair Manual. It covers every single detail on your Caterpillar Cat 247B 257B Service Repair. This is the authentic factory service manual from Caterpillar which covers every repair and service procedure.
Caterpillar Cat 216B, 226B, 232B, 242B Skid Steer Loader Parts Manual. Caterpillar CAT 226B2 Skid Steer Loader Parts Manual. Caterpillar CAT 236D Skid Steer Loader Parts Manual. Caterpillar CAT 236B2 Skid Steer Loader Parts Manual. Caterpillar Cat 308CR Mini Hydraulic Excavator Parts Manual (GG81-Up) Caterpillar Cat 311CU Track Type Excavator.
Multi terrain loader Caterpillar 257B Service manual: CAT11-050: 257B3. Skid steer loader Caterpillar 228 Service manual: CAT11-117: 232: Skid steer loader.
Soundflower for windows 7 free download. Engine:- All engines included Alice in wonderland slots.
Model Specific Model Year: All LANGUAGE: English FORMAT: PDF ZOOM IN/OUT: YES Instant Download: YES COMPATIBLE: All Versions of Windows & Mac
This is not generic repair information! It is vehicle specific. This is the exact same manual used by technicians at the dealership to maintain, service, diagnose and repair your Caterpillar.
Complete step-by-step instructions, diagrams, illustrations, wiring schematics, and specifications to completely repair your vehicle with ease!
You get everything you will ever need in one easy-to-use pdf manual. No more flipping through books to find what you need. Print only the pages and diagrams you require. No more greasy pages or torn/lost paper manuals again.
All pages are printable, so print off what you need and take it with you to your vehicle or workshop. You can blow-up images and then print off enlarged copies!
This is the factory specific, highly detailed repair manual, with complete instructions and illustrations, wiring schematics and diagrams to completely service and repair your Caterpillar.
All Manuals Are Windows and Mac compatible!
YOU WILL BE GIVEN THE DOWNLOAD IMMEDIATELY UPON RECEIPT OF YOUR PAYMENT. NO WAITING!
Tons of pictures and diagrams at your fingertips!!
Save Money $$ By doing your own repairs! These manuals make it easy for any skill level WITH THESE VERY EASY TO FOLLOW, STEP-BY-STEP INSTRUCTIONS!
INSTANT DOWNLOAD means NO SHIPPING COST or WAITING FOR A BOOK OR CD TO ARRIVE IN THE MAIL…YOU WILL RECEIVE THIS MANUAL TODAY VIA DOWNLOAD ON COMPLETION OF PAYMENT VIA OUR SECURE PAYMENT PROCESSOR. WE ACCEPT ALL MAJOR CREDIT/DEBIT CARDS
Categorized in Skidder
Installing Counterweights on Multi Terrain Loaders and Skid Steer Loaders{7056}
Compact Track Loader:
259B3 (S/N: YYZ1-UP)
Multi Terrain Loader:
247B3 (S/N: ESL1-UP; TSL1-UP; KB31-UP)
257 (S/N: CMM1-UP)
257B (S/N: SLK1-UP)
257B2 (S/N: SLK1-UP)
257B3 (S/N: B7H1-UP)
287 (S/N: CNY1-UP)
287B (S/N: ZSA1-UP)
Skid Steer Loader:
216 (S/N: 4NZ1-UP)
216B (S/N: RLL1-UP)
216B2 (S/N: RLL1-UP)
216B3 (S/N: JXM1-UP; DSN1-UP; CD31-UP)
226 (S/N: 5FZ1-UP)
226B (S/N: MJH1-UP)
226B2 (S/N: MJH1-UP)
226B3 (S/N: SNA1-UP; MWD1-UP; AS21-UP)
228 (S/N: 6BZ1-UP)
232 (S/N: CAB1-UP)
232B (S/N: SCH1-UP)
232B2 (S/N: SCH1-UP)
236 (S/N: 4YZ1-UP)
236B (S/N: HEN1-UP)
236B2 (S/N: HEN1-UP)
236B3 (S/N: A9H1-UP)
242 (S/N: CMB1-UP)
242B (S/N: BXM1-UP)
242B2 (S/N: BXM1-UP)
242B3 (S/N: SRS1-UP)
246 (S/N: 5SZ1-UP)
246B (S/N: PAT1-UP)
248 (S/N: 6LZ1-UP)
248B (S/N: SCL1-UP)
252 (S/N: FDG1-UP)
252B (S/N: SCP1-UP)
252B2 (S/N: SCP1-UP)
252B3 (S/N: TNK1-UP)
262 (S/N: CED1-UP)
262B (S/N: PDT1-UP)
268B (S/N: LBA1-UP)
Introduction
This Special Instruction outlines the steps for installing counterweights on the multi terrain loaders and the skid steer loaders that are listed above.
The counterweights may be required for the following applications: wide buckets, heavy work tools and handling dense material.
The 185-9940 Counterweight and the 185-9941 Counterweight increase the rated operating capacity of a skid steer loader by additional 45.5 kg (100 lb). The 190-8042 Counterweight increases the rated operating capacity of a skid steer loader and a multi terrain loader by an additional 23 kg (50 lb). The 191-9566 Counterweight increases the rated operating capacity of a skid steer loader and a multi terrain loader by an additional 38 kg (84 lb). The 218-6018 Counterweight increases the rated operating capacity of a skid steer loader and a multi terrain loader by an additional 36 kg (80 lb). The 220-8135 Counterweight REDUCES the rated operating capacity of a skid steer loader by 10 kg (22 lb).
The usage of the different counterweights is identified in Table 1.
Facebook casino games real money. The information in this instruction should be read and understood before you proceed with any modifications. Also refer to the Service Manual for the machine.
Do not install front counterweights on the 228 and 248 Skid Steer Loaders.
Installation of 185-9940 Counterweight
The counterweight consists of two sets of counterweights. There is one set for the front and one set for the rear. Do not install the front set of counterweights on the 228 Skid Steer Loader.
Required Parts
Show/hide table
Table 2
185-9940 Counterweight
Item
Part Number
Description
Qty
1
183-7131
Block (1)
2
2
183-7123
Block (Left Hand)
1
183-7124
Block (Right Hand)
1
3
8T-4189
Bolt
4
4
8T-4648
Bolt
4
5
8T-4223
Hard Washer
4
6
8T-4224
Hard Washer
4
( 1 )
This part is not for installation on the 228 skid steer loader.
Show/hide table
Table 3
Additional Supplies
9S-3263
Thread Lock Compound
Installation Procedure (Front)
Do not install front counterweights on the 228 Skid Steer Loaders.
Park the machine on level ground.
Raise the cab. Refer to the Operation and Maintenance Manual for the proper procedure.
Illustration 1
g01030353
Remove side panel (7) .
Show/hide table
Illustration 2
g01030354
Remove floor panel (8) .
Illustration 3
g01030355
Drill four 11 mm (0.5 inch) holes in the front of the frame. Refer to Illustration 3 and Table 4.
Note: The holes might be predrilled. Proceed to Step 6 if the holes are predrilled.
Show/hide table
Table 4
Placement of the Front Counterweights
Dimension
mm
inches
A
(88)
(3.5)
B
(100)
(3.9)
C
(50)
(2)
Illustration 4
g01030356
Apply 9S-3263 Thread Lock Compound to the threads of two bolts (3) before installing block (1), the bolts and two washers (6) .
Repeat the procedure for the other side.
Show/hide table
Illustration 5
g01030354
Install floor panel (8) .
Illustration 6
g01030353
Install side panel (7) .
Lower the cab. Refer to Operation and Maintenance Manual for the proper procedure.
Installation Procedure (Rear)
Show/hide table
Illustration 7
g01030357
On one side of the machine, drill four 15.5 mm (0.6 inch) holes in the rear of the frame. Refer to Illustration 7 and Table 5.
Note: The holes might be predrilled. Proceed to Step 2 if the holes are predrilled.
Table 5
Placement of the Front Counterweights
Dimension
mm
inches
D
(85)
(3.3)
E
(45)
(1.8)
F
(143)
(5.6)
Show/hide table
Illustration 8
g01030358
Apply 9S-3263 Thread Lock Compound to the threads of two bolts (4) before installing block (2), the bolts and two washers (5) .
Repeat the procedure for the other side of the machine.
Installation of 185-9941 Counterweight
The counterweight consists of two sets of counterweights. There is one set for the front and one set for the rear. Do not install the front set of counterweights on either the 248 skid steer loader.
Required Parts
Table 6
185-9941 Counterweight
Item
Part Number
Description
Qty
1
183-7131
Block (1)
2
2
183-7133
Block (Left Hand)
1
183-7134
Block (Right Hand)
1
3
8T-4189
Bolt
4
4
8T-4648
Bolt
4
5
8T-4223
Hard Washer
4
6
8T-4224
Hard Washer
4
Show/hide table
( 1 )
This part is not for installation on the 248 skid steer loader.
Table 7
Additional Supplies
9S-3263
Thread Lock Compound
Installation Procedure (Front)
Mad father game for mac. Do not install front counterweights on either the 248 skid steer loader.
Park the machine on level ground.
Raise the cab. Refer to the Operation and Maintenance Manual for the proper procedure.
Show/hide table
Illustration 9
g01030353
Remove side panel (7) .
Illustration 10
g01030354
Remove floor panel (8) .
Show/hide table
Illustration 11
g01030355
Drill four 11 mm (0.5 inch) holes in the front of the frame. Refer to Illustration 11 and Table 8.
Note: The holes might be predrilled. Proceed to Step 6 if the holes are predrilled.
Table 8
Placement of the Front Counterweights
Dimension
mm
inches
A
(88)
(3.5)
B
(100)
(3.9)
C
(50)
(2)
Show/hide table
Illustration 12
g01030356
Apply 9S-3263 Thread Lock Compound to the threads of two bolts (3) before installing block (1), the bolts and two washers (6) .
Repeat the procedure for the other side.
Illustration 13
g01030354
Install floor panel (8) .
Show/hide table
Illustration 14
g01030353
Install side panel (7) .
Lower the cab. Refer to Operation and Maintenance Manual for the proper procedure.
Installation Procedure (Rear)
Illustration 15
g01030357
On one side of the machine, drill four 15.5 mm (0.6 inch) holes in the rear of the frame. Refer to Illustration 15 and Table 9.
Note: The holes might be predrilled. Proceed to Step 2 if the holes are predrilled.
Show/hide table
Table 9
Placement of the Front Counterweights
Dimension
mm
inches
D
(98)
(3.9)
E
(20)
(0.8)
F
(180.4)
(5.6)
Illustration 16
g01030358
Apply 9S-3263 Thread Lock Compound to the threads of two bolts (4) before installing block (2), the bolts and two washers (5) .
Cat 257b Skid Steer For Sale
Repeat the procedure for the other side of the machine.
Installation of 190-8042 Counterweight
Required Parts
Show/hide table
Table 10
190-8042 Counterweight
Item
Part Number
Description
Qty
1
191-9742
Block
1
2
191-9743
Plate
1
3
8T-4122
Hard Washer
2
4
8T-7338
Bolt
2
Table 11
Additional Supplies
9S-3263
Thread Lock Compound
Installation Procedure
Show/hide table
Illustration 17
g01030383
Open the engine access door.
Remove screws (5) and bolts (7) that secure cover (6) in place before removing the cover.
Install block (1) to the bumper.
Apply 9S-3263 Thread Lock Compound to the threads of bolts (4) before installing plate (2), the bolts, and washers (3) .